ARA
ARA
ARA Home Contact Us
————————————————

 

showcase

GBS and SPAR Study

Problem Statement and Objectives
ChevronTexaco Energy Technology needed to critically review GRI Pipeline Reliability Methodology reports, identify ILI inspection optimization implementation issues, and develop a proposal for additional methodology with detailed implementation procedures and software capable of generating pipeline system inspections, repairs or other mitigation plans.

  • Reliable
  • Practical
  • Useful

Results and Benefits
ARA developed a more efficient methodology for determining optimal In-Line Inspection (ILI) schedules. The improved methodology runs the first optimal inspection after pipeline installation, provides information about what repairs should be made, and recommends subsequent inspection schedules and mitigation plans.

 

 

gbs_spar

 

FooterSite Map Contact

Applied Research Associates, Inc. • 4300 San Mateo Blvd. NE • Suite A-220 • Albuquerque, NM 87110 • Ph. 505.881.8074 Fax 505.883.3673 • email info@ara.com
Note: Applied Research Associates, Inc. does not offer engineering services in the State of North Carolina.
Please contact Applied Research Associates of North Carolina, P.C. to inquire about engineering services in this state. (919) 876-6018

Contac Us Site Map